Location: Țăndărei (Valea Ciorii), Ialomița County
Installed capacity: ~45.15 MW photovoltaic
Photovoltaic panels:~64,512 modules
10 inverters: 9 × 4600 kVA and 1 × 4000 kVA, for converting DC to AC
35/110 kV station within the park: Includes a transformer with a capacity of 63 MVA
A 110 kV underground line for evacuating energy into the grid
A connection station for connecting to the National Energy System (SEN)
Energo Line Equipment’s participation in this project through an equipment and services supply contract with the general contractor Visual Fan/Allview Renewable EPC:
Supply and installation of 110 kV EHVS 145TWS type joints – 30 pieces
Supply and installation of 110 kV OHVT-145C type terminations – 6 pieces Supply and installation of three-phase
110 kV cable screen disconnect boxes – 12 pieces